Mobile
Log In Sign Up
Home > chinese-english > "fill section" in English

English translation for "fill section"

路堤断面
路堤截面
填方断面


Related Translations:
pores filling:  填孔
ampoule filling:  安瓿灌装
filling date:  交发日期申请日
vein filling:  脉质
fill ratio:  充水比压缩比装填系数
filled system:  充满式系统
filled in:  已填满的
filling block:  垫块
filled ground:  充填地基填土基椿填土地基
bulk filling:  大规模回填
Example Sentences:
1.Saponification slag - fly ash can be used in the high fill sections of highway
皂化渣粉煤灰可以用做桥头等高填土路段的回填材料。
2.In the case of vacancies of appointed seats it is also not mandatory that he has to appoint any substitutes to have the seats filled section 16
至于在有委任议席出缺时,条例却无限令行政长官一定要委出新人填补见第16 2条。
3.Because the soft deposit contains silt , floury thin sand , medium thin sand , fill section and so on , the scheme of foundation treat can not be easily decided
由于软基中含有淤泥、粉细砂、中粗砂、杂填土等,且土质很不均匀,基础处理方案很难确定。
4.Filling sections of mesozoic - cenozoic tectonically active basins in china can generally be divided into five ordered , correlatable sequence stratigraphic units
摘要中国中、新生代构造相对活动的断陷或陆内前陆盆地充填序列一般可划分出5个级别具有地层对比意义的层序地层单元。
5.According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in zhanjiang city , this paper makes the experimental analysis on it and advances some corresponding measures
根据湛江海湾大桥连接线一期工程某些填方路段出现龟裂的情况,进行了试验分析并提出了相应措施。
6.Based on the theory of limit equilibrium and limit analysis approaches , a new calculation module is presented to study the fracture mechanism of foundations adjacent to or above slopes , which can consider the effect of ascent of fill section at the back of slopes . in the calculation of the ultimate bearing capacity of sloping ground with program written , the mobilization factor of the fill section at the back of the sloping ground in different conditions is gained . and , the bearing capacity factors and mobilization factor can be used in theory analysis and design of sloping ground
为了研究斜坡地基的破坏机理,本文还利用极限平衡法和极限分析法建立了一个新的能考虑坡后土体坡度影响的斜坡地基的计算模式,通过编程对斜坡地基的极限承载力进行了计算,得出了不同地基情况下的斜坡地基坡后土体的发挥系数,得到的斜坡地基的承载力系数和发挥系数可用于斜坡地基的理论分析和设计当中。
Similar Words:
"fill rock" English translation, "fill sails" English translation, "fill sb in on" English translation, "fill sb in on sth" English translation, "fill sb’s shoes" English translation, "fill seismic facies" English translation, "fill seismic reflection configuration" English translation, "fill selector" English translation, "fill setting device" English translation, "fill settlement" English translation